Deployable structures. Built to stow small, deploy reliably, and perform on orbit.

Next-Gen dragNET. Passive deorbit in a shoebox-sized package, deploying to 12.5m² on orbit.

  • 230X area gain ratio
  • Single actuation event deployment
  • FCC five-year rule compliant
  • Minimal spacecraft interface impact
  • Scalable for any spacecraft or separation system
  • Fits within 15" motorized lightband keep out zone
  • Passive deorbit conserves mission resources
MMA Space Deorbit Systems Next-Gen dragNET stowed image.

dragNET. The original flight-proven dragsail that set the standard for passive deorbit.

  • Flight proven since 2013
  • Successfully deorbited the Minotaur I ORS-3 upper stage within 2 years
  • Passive drag sail deployment via stored strain energy
  • Single actuation event deployment
  • FCC five-year rule compliant
  • Scalable for different separation systems and mounting locations
MMA Space Deorbit Systems dragNet image.

Download the dragNET datasheet. Full specifications and performance data for the dragNET Deorbit System.

Engineered to deploy. The principles behind every deployable system we build.

  • Reliable

    Redundant controls ensuring deployment once commanded. Flight proven on orbit with 100% deployment success rate.

  • Compact

    High expansion ratios and designed to package small to enable maximizing space vehicle payload footprint.

  • Scalable

    From CubeSats to ESPA-class and beyond. Every product in the portfolio scales to fit your spacecraft and mission requirements.

  • Validated

    Deployment rigorously validated on the ground to ensure on-orbit success.

Space sustainability. Flight-proven passive deorbit technology keeping space accessible for future generations.

Flight-proven since 2013
FCC five-year rule compliant
Multiple successful deorbits
Any mission, any spacecraft

Flight heritage. Two decades of hardware performing on orbit.

  • 2026

    CU Instrumentation Boom

    Our deployable instrumentation boom for CU Boulder's entry in the Magquest challenge, launched in 2026, has deployed on orbit and is operating as expected.

  • Spire Instrumentation Boom

    Our deployable instrumentation boom for Spire's entry in the Magquest challenge, launched in March 2026, has deployed on orbit and is operating as expected.

  • 2023

    Caltech SSPP

    Space Solar Power Demonstrator, testing key components for harvesting solar power in orbit and beaming energy to Earth.

  • 2022

    Argos De-Orbit

    MMA's dragNET De-orbit System launched on a RocketLab Electron aboard the GAzelle Satellite carrying Argos-4, part of the NOAA Cooperative Data and Rescue Services Program.

  • 2019

    FalconSat-7

    MMA provided a deployable membrane photon sieve to demonstrate large aperture optical telescope technologies, in partnership with AFRL to image the sun.

  • 2013

    dragNET De-Orbit System

    Two dragNET De-orbit Systems launched on the Minotaur I ORS-2 Mission. One successfully de-orbited the upper stage of the launch vehicle in January 2016, 2.1 years after launch.

More tech. See other flight-proven solutions from our team.

  • Space Antennas

    MMA's deployable antenna systems offer significant advantages in compaction, simplicity, scalability, and cost across a wide range of frequencies and mission types.

    See more
  • Space Solar Arrays

    MMA's deployable solar arrays deliver high performance across CubeSat, SmallSat, and constellation-scale platforms, engineered for any orbit and mission.

    See more

Your mission starts here. Reach out and let's find the right solution for your program.

Contact us